December 2, 2011
Skema yvir Skandinavisku finaluna hjá Lego Vinum (talan er um norskar tíðir, tí vit eru ein tíma frammanfyri):
Kl.
10:00 Teori10:40 Runda 1 - Bani 1a12:30 Teknik13:17 Runda 2 - Bani 1b13:45 Profilering14:30 Runda 3 - Bani 1aHetta er okkara básur: Vit skriva meir í morgin aftaná kappingina :)
Her er linkið um tú vilt síggja tað beinleiðis:http://legovinir.yolasite.com/streaming.php
Posted by Rógvi Langgaard. Posted In : Day-blog
December 2, 2011
Now we are in Gjøvik, Norway :) It is here the competition is. The trip went well, and we are almost ready for the competition tomorrow ;)
Posted by Rogvi Langgaard. Posted In : Day-blog
November 30, 2011
Today we made the technical project and maked a logo to put on our new hats. It went well :)
Posted by Rógvi Langgaard. Posted In : Day-blog
November 28, 2011
Today we trained the theoretical challenge. Also we made the last hats. We finished eith making a Step 5, which just take 8 seconds to drive :)
Posted by Rógvi Langgaard. Posted In : Day-blog
November 28, 2011
Today we made new hats, because the older ones were not in good shape. Also we made a logo, and finished the kitchen. When all that was done, we trained us to run the robot :)
Posted by Rógvi Langgaard. Posted In : Day-blog
November 28, 2011
Now we finally got the robot done :) Rógvi and Jógvan trained how to switch frames faster, and it looks like we have 12 seconds more to make something else on the robot field. I think we will drive over to the east wall to get some more points ;)
Unfortunatly the kitchen that we are working on, falled down on the floor. That means that John, Ari, Rani and Bárður, used all day to build it once again...:/
Step 4 done:
Posted by Rógvi Langgaard. Posted In : Day-blog
November 28, 2011
Today we made the video, that the makers of the scandinavian final, said we should make before today. That went well. Afterwards we were in Berglon and showed other people the robot, and how it solves all the missions. Sadly there were not so many people.
Posted by Rógvi Langgaard. Posted In : Day-blog
November 28, 2011
We have just made our new website :) In this blog we will write about how we are working every day until the 3. of December ;)
Posted by Rógvi Langgaard. Posted In : Day-blog
November 28, 2011
Now
everything is finished :) We did manage to program step 4 again which was a
bit unexpected. We also got time to fine polish the other steps and now they
works 100% five times in a row.
Posted by Rógvi Langgaard. Posted In : Day-blog
November 28, 2011
We have
trouble opening step 4 and have to program the whole step again. We did find
an old pease of the program to helpe us along. Everything else went well
today. We got all the other steps done (almost).
Posted by Rógvi Langgaard. Posted In : Day-blog